MMTS work in Hyderabad
The Engineering Survey, Traffic Survey, geotechnical/ Geological/ Seismological/ Environmental/Soil and Material and other investigations completed, Inception and Detailed Design Standards Reports completed and all reports submitted to ERC, which have been approved. Preliminary design, detailed design, quantity estimate, Bill of Quantities, Detailed Project Report and bid documents have been prepared and submitted to Ethiopian Railways Corporation (ERC) through OID
The details of works completed are:
i) Earthwork in cutting as well as embankment including compaction.
ii) Moorum blanketing including compaction.
iii) Laying of plain track with 52 kg rails on PSC sleepers on 250 mm ballast cushion including running out of ballast.
iv) Laying of plain track 4.60 km including aligning, lifting and packing & boxing.
v) Laying of 7 Nos. of 1 in 8.5 turn outs with curved switches and CMS Crossings.